Fish Screen Validation
The objective of this ongoing study is to validate the performance of fish screens located at a diversion damn and fish passage. Measurements are made with an Argonaut ADV to ensure that the velocity of water moving through the screens does not exceed tolerable thresholds.
Instrumentation for this study includes:
- Sontek River Surveyor M9
- Argonaut ADV with custom mount and jig